Roofing crew installing architectural shingles on a Charleston home

Roofing that holds the line.

Your roof is the first thing a Lowcountry storm tests. We install asphalt, architectural, and standing seam metal systems with the underlayment, flashing, and ventilation details that decide whether a roof lasts twenty years or leaks in two.

What's Included

Exactly what you're paying for.

  • Tear-off, deck inspection, and rotten sheathing replacement
  • Synthetic underlayment and ice-and-water at all vulnerable areas
  • Step, valley, chimney, and wall flashing replaced — not reused
  • Ridge and soffit ventilation balanced for attic airflow
  • Drip edge, boots, and penetration sealing
  • Full site cleanup with magnetic nail sweep

If the deck is sound, we tell you. If it isn't, we photograph it, price it before we proceed, and you approve it in writing.

Built for the Lowcountry

Wind, water, heat, humidity, salt.

  • 01Wind-rated fastening patterns and sealed edges for coastal gusts
  • 02Corrosion-appropriate fasteners and flashings for salt air
  • 03Ventilation sized for Charleston heat and humidity loads

Our Process

No surprises, start to finish.

  1. 01

    Inspection

    We get on the roof, document condition with photos, and check attic ventilation and moisture — not a driveway estimate.

  2. 02

    Scope & Proposal

    You get a line-item scope: system, underlayment, flashing, ventilation, and warranty. No vague allowances.

  3. 03

    Build

    One crew, one lead, one point of contact. We protect the site daily, communicate changes before they happen, and keep the schedule we gave you.

  4. 04

    Walk & Warranty

    We walk the finished work with you, correct anything on the punch list, and hand over written workmanship and manufacturer warranty documentation.

Before & After

What actually changes.

Not just a nicer photo. Each pair shows the failure we found and the detailing that keeps it from coming back in Lowcountry wind, water, heat, and salt air.

Storm-worn asphalt roof, James Island

Drag to compare

New architectural shingle roof with clean chimney flashing and ridge ventCurling algae-streaked shingles and rusted chimney flashing before roof replacementBeforeAfter
Before: shingles curled from heat cycling, algae streaking from constant humidity, and rusted chimney flashing already letting water past the first line of defense.After: architectural shingles over synthetic underlayment, all new metal flashing, and a balanced ridge vent that pulls heat and moisture out of the attic.

Lowcountry gain: wind-rated fastening at the eaves and rakes, corrosion-resistant flashing for salt air, and ventilation sized for Charleston heat — the three things that decide whether a roof lasts twenty years here.

Gallery

The work itself.

Architectural shingle installation in progress
Architectural shingle installation in progress
Flashing detail at a roof-to-wall transition
Flashing detail at a roof-to-wall transition
Completed exterior of a Lowcountry home
Completed exterior of a Lowcountry home

FAQ

Roofing questions, answered straight.

Timelines, process, and warranty — the things people actually ask before they sign. If yours isn't here, call and we'll answer it the same way.

(843) 920-6377
How long does a roof replacement take?

Most Charleston-area homes are torn off and dried in the same day, with the full replacement finished in one to three days depending on size, pitch, and complexity. Metal systems typically run three to five days.

What happens if you find rotten decking?

We photograph it, show you, and give you a per-sheet price before we replace anything. Nothing gets covered up and nothing gets billed without your written approval.

Do you handle storm and insurance claims?

Yes. We document damage with photos and a written condition report you can hand to your adjuster, and we can meet the adjuster on site so the scope reflects what the roof actually needs.

What warranty comes with the work?

Every roofing project carries a written workmanship warranty from us plus the manufacturer's product warranty on materials. You get both documents at the final walkthrough, along with the product lines and colors we installed.

Who is on site and who do I call?

One crew, one lead, one point of contact. You get a direct number for your project lead — not a call center — and we tell you about schedule changes before they happen, not after.

How do payments and change orders work?

A deposit at scheduling, progress payments tied to milestones, and the balance at completion after your punch list is cleared. Any change is priced and approved in writing before we do the work.

Specialty roofing

Ready to talk roofing?

Tell us about the project. We'll give you a clear scope, a real schedule, and one accountable team.

Free Inspection

Request a Free Lowcountry Inspection.

We walk the whole exterior — roof, walls, openings, drainage — and tell you what's failing, what's fine, and what it costs to fix. No pressure, no guesswork.

View our Privacy Policy and Terms and Conditions.